Estimating Required Contingency Funds for Construction Projects Using Multple Linear Regression - Jason J Cook - Bøger - Biblioscholar - 9781288332021 - 21. november 2012
Ved uoverensstemmelse mellem cover og titel gælder titel

Estimating Required Contingency Funds for Construction Projects Using Multple Linear Regression


Få en e-mail når varen bliver tilgængelig
Har du en konto? Log ind
Modtag notifikation om nye Jason J Cook udgivelser
Tilføj til din iMusic ønskeseddel
eller

Ikke bedømt endnu

Publisher Marketing: Cost overruns are a critical problem for construction projects. The common practice for dealing with cost overruns is the assignment of an arbitrary flat percentage of the construction budget as a contingency fund. This research seeks to identify significant factors that may influence, or serve as indicators of, potential cost overruns. The study uses data on 243 construction projects over a full range of project types and scopes gathered from an existing United States Air Force construction database. The author uses multiple linear regression to analyze the data and compares the proposed model to the common practice of assigning contingency funds. The multiple linear regression model provides better predictions of actual cost overruns experienced. Based on the performance metric used, the model sufficiently captures 44% of actual cost overruns versus current practices capturing only 20% The proposed model developed in this study only uses data that would be available prior to the award of a construction contract. This allows the model to serve as a planning tool throughout the concept and design phases. The model includes project characteristics, design performance metrics, and contract award process influences.

Medie Bøger     Paperback Bog   (Bog med blødt omslag og limet ryg)
Udgivet 21. november 2012
ISBN13 9781288332021
Forlag Biblioscholar
Antal sider 68
Mål 189 × 246 × 4 mm   ·   140 g