Feasibility Study for a Risk-informed and Performance-based Regulatory Structure for Future Plant Licensing: Main Report - U.s. Nuclear Regulatory Commission - Bøger - CreateSpace Independent Publishing Platf - 9781500611279 - 22. juli 2014
Ved uoverensstemmelse mellem cover og titel gælder titel

Feasibility Study for a Risk-informed and Performance-based Regulatory Structure for Future Plant Licensing: Main Report

U.s. Nuclear Regulatory Commission

Pris
DKK 202

Bestilles fra fjernlager

Forventes klar til forsendelse 27. okt. - 3. nov.
Tilføj til din iMusic ønskeseddel
eller

Feasibility Study for a Risk-informed and Performance-based Regulatory Structure for Future Plant Licensing: Main Report

The purpose of this NUREG is to establish the feasibility of developing a risk-informed and performance-based regulatory structure for the licensing of future nuclear power plants (NPPs). As such, this NUREG documents a ?Framework? that provides an approach, scope and criteria that could be used to develop a set of requirements that would serve as an alternative to 10 CFR 50 for licensing future NPPs; however, this Framework is not the entire process. It is an initial phase in is to demonstrate the feasibility of such a concept, recognizing that for full implementation there will be outstanding programmatic, policy, and technical issues to be resolved. As such, this feasibility study does not represent a staff position, but rather a significant piece of research. The second phase, which involves implementation, is comprised of several, iterative steps: resolution of issues, development of draft requirements and regulations, pilots and tests, and rulemaking.

Medie Bøger     Paperback Bog   (Bog med blødt omslag og limet ryg)
Udgivet 22. juli 2014
ISBN13 9781500611279
Forlag CreateSpace Independent Publishing Platf
Antal sider 182
Mål 216 × 279 × 10 mm   ·   435 g
Sprog Engelsk  

Vis alle

Mere med U.s. Nuclear Regulatory Commission